81
Slide brackets are trash will require replacement.
|
82
Topside stripped complete.
|
83
Cabinet is gutted of useful needed parts.Things like the buttons,lockbar mech etc are all trash and not worth pulling
|
84
Ready for the dumpster.
|
85
I will start working through all the parts now.
|
86
Coil assemblies will be first.This is the rigged coil that was taped together.It will need some parts before it can be p
|
87
The other everyday coils are cleaned ,polished rebuilt and relabeled.Even if the brackets are no good I easily have spa
|
88
Speaking of problematic we have the ramps to deal with.I had hoped to wait on replacements but they just have not ma
|
89
|
90
The ramp decals are a mess.There was electrical tape stuck all the way around the ramp that has since been removed.
|
91
|
92
This decal can't be removed nor transferred so I will do the best I can with it.
|
93
The flaps will be replaced.
|
94
I will clean and polish the ramp as well as possible.
|
95
All ramp decals are removed and the glue is cleaned off of them.This is a tedious job the ramps have way more decals th
|
96
The ramp is thoroughly washed,polished and flamed all brackets and parts are polished and a new stainless flap will be
|
97
Cabinet is sanded and ready to paint.
|
98
|
99
Cabinet painted.
|
100
Head painted.
|
101
Lower painted and dry.
|
102
Head is ready to screen.
|
103
Head screened.
|
104
Playfield is being prepped.It is a rough one.
|
105
Playfield sanded.
|
106
Shooter lane is sanded as clean as possible.a light repaint will be needed most likely.
|
107
There are some extra holes or more impotantly a broken screw in the upper small hole that someone just decided to leav
|
108
Ball drop is hammered!
|
109
There is no way around the need to fill the switch cut out/ball drop.It is just too bad off not to .
|
110
Rat hole repair is needed.
|
111
Repair is being made.
|
112
The wear in this hole will require filling.
|
113
Repair is being made there.
|
114
Repairs to the structures noted are complete.
|
115
|
116
|
117
Playfield will need to be cleared before more work can be done because it is too fragile in this condition to tape
|
118
Cabinet is prepped for decals.
|
119
|
120
Decals applied.
|