121
|
122
|
123
Head is ready to build.
|
124
Chrome trim installed as requested.Head is on lower.
|
125
|
126
Neatly braided.Pivot points are upgraded to the protective plates to eliminate that awful interior gouging that was
|
127
|
128
Power box will be reworked.The plus and wiring are a problem as well as the open hole that has not outlet nor outlet
|
129
Box rebuilt.
|
130
New flipper boards are needed as well as the correct hardware.Game should run type 1 boards and hardware.
|
131
Flipper boards built and in place.
|
132
Game was missing the knocker entirely.Knocker assembly is created.
|
133
Button harness has been remade in a neater loger version.
|
134
Up on legs lamp panel in place.
|
135
|
136
|
137
Cabinet is neatly wired.New lock bar mech was needed and the correct style door was sourced and installed.
|
138
|
139
|
140
|
141
Back to the playfield.It is cleared for the first time just to seal it up so I can work with it.Very rough one here
|
142
|
143
Will repaint this area as well as possible during the next session.
|
144
Will deal with other issues at that time also like the extra hole and screw.
|
144a
|
145
Inserts will need to be reworked once they are more level.
|
145a
|
146
The dreaded repair to Dracs face is in the plan for the next session as well.Tough repair I see almost no one else de
|
147
Target cut out will need work.
|
148
|
149
|
150
After this cures a couple days I will get it going.Should be downhill from there.
|
151
Playfield is sanded and ready to begin repaints.
|
152
All woodtones will have to be repainted including the shooter lane.
|
153
This is a bit more challenging than it might look.Will do the best I can with it.
|
154
Center inserts need yellow and black border work.
|
155
The face and other areas will be addressed.
|
156
Wood tones are done.
|
157
Worst part is the face in terms of trying to get it right so I am doing that first.
|
158
Now all the yellow work.There are two different shades one a bit more golden than the other.
|