121
Apron is also final sanded and ready to polish now.
|
122
Apron is polished.
|
123
|
124
No decal lumps or edges.Looks like a screened apron only better.
|
125
|
126
|
127
New transilte
|
128
|
129
Comparison between the two.
|
130
New translite installed.Built with new lower channel that actually fits the glass properly.
|
131
Will rework the lamp panel now.Dirty.
|
132
Panel is stripped.
|
133
Panel is refinished.
|
134
Panel is sanded clean on the back and rebuilt.All metal was polished,
|
135
New label applied.New bulbs will be installed once the panel is in place.
|
136
Cabinet is sanded and ready to base and matte clear.
|
137
Head is also prepped.
|
138
Bolts are stripped as well.
|
139
Bolts refinished.
|
140
Head refinished.
|
141
Lower refinished(still wet).
|
142
|
143
Cabinet is neatly braided.
|
144
Decals are being applied.
|
145
IJ is very sensitive to alignments so the front will be finished then the sides applied for the best possible resul
|
146
|
147
Head is decaled.
|
148
Front is finished sides are applied.
|
149
|
150
Edges are finished .Protectors are in place.
|
151
New channels are installed.
|
152
Not a fan of the speaker block that does not match the floor.
|
153
Matching block is installed .
|
160
Powder coated hinges will be used to better match the cabinet and tie the art and transition of the head and lower togethe
|
161
Where the hinge sets on the lower is glossy black.
|
162
Where the head comes off the head is also gloss black which is why the gloss black hinges are a better fit on this and man
|
163
Newly serviced driver board.
|
164
Boards are in place and being wired.
|
165
The LED OCD board is neatly mounted and done so using screws and stand offs.All screws used are factory style and not g
|
166
A nice used coin door is reworked and finished now installed.It is a better style for IJ than the one that was previously i
|