1
STTNG base game prior to set up.
|
2
Cabinet is trashed all the way around first is the huge ply coming off under the right front leg.
|
3
Holes drilled in several spots in the front .places they should not be.
|
4
More holes,buckled coin door.
|
5
Setting it up on legs now.
|
6
|
7
|
8
This is not the right spot for the latch.Has been moved because it is severely damaged at the original spot.
|
9
|
10
The playfield is no better off most of the issues here are the hacks rigs and poorly done modifications.
|
11
Hardware was just sprayed black all over the place to hide the rust and corrosion I am guessing.
|
12
There are several things wrong here,the color and placement of the various ships is the first.
|
13
|
14
Has the wrong shuttle on the right ramp.
|
15
Broken weld on the wireform and painted silver .Stickers placed on the weldements as well.
|
16
Translite is rough.
Can be salvaged if absolutely necessary but a replacement will be looked for first.
|
17
The channels are taped on someone has painted spots on it.
|
18
Inside the head now.Dirty which is expected.
|
19
Boards are all there good.
|
20
Lots of repairs to these boards so I will document that later but all should be serviceable.
|
21
Head gutted.
|
22
Underside.It is horrible really.The biggest issue is the wiring.There are so many hacks and lousy repairs it is going to be
|
23
Just trying to document the wiring issues here.
|
24
|
25
|
26
Good picture to highlight the corrosion and wiring hacks.
|
27
|
28
More wiring troubles.
|
29
Inside the cabinet is about like the rest of it.
|
30
|
31
|
32
|
33
|
34
Wiring is being removed one harness at a time.
|
36
Wiring is separated and will be dealt with one section at a time.
|
37
|
38
|
39
By far the switch harness is the worst of the lot and will require lots of extra attention.
|
40
|
41
Cannons will need new harnesses and various parts to be fully functional and cosmetically acceptable as well.
|