121
Cabinet has been spot puttied in the very minor places primer did not fill and ground coated to ensure the final sanding p
|
122
Lower is sanded and prepped for paint.
|
123
The floor was sanded clean and has been masked off.
|
124
Paint has been sprayed.After is dries I will install the new rear chocks.
|
125
Paint is dry and now I have finished detailing the bottom of the cabinet.
|
126
The exterior in the decaled areas has been lightly sanded to eliminate any imperfections prior to installing the decals
|
127
The floor is much improved and has a nice fresh look.
|
128
New reinforced leg plates and ground braid have been installed.
|
129
The new interior chocks were also installed.They are made of oak and have been both finish nailed and glued in place.The
|
130
New chocks and sliders have been installed on the rear.The lower cabinet is now ready to decal.
|
131
The head is sanded and ready to refinish.
|
132
|
133
Head refinished in the correct base color.WH2O is unique in that it has a black lower cab in trim out but a blue trim out
|
134
Still a little tacky in this pic but once it dries overnight I will graound braid then rescreen the warning text.
|
135
Warning text is screened.
|
136
Head ground braided and decaled.After they sit overnight I will finish the edges.
|
137
Lower cabinet sides have been decaled.
|
138
|
138A
Front decal is in place.
|
139
While waiting on the cabinet decals I will get back to dealing with the parts to the cabinet.The rusted beaten bolts and
|
140
Bolts and trim etched then refinished.
|
141
Decal edges are finished.
|
142
|
143
|
144
The decal edges are matched up as needed to the cabinet.
|
145
The head edges are finished as well.
|
146
|
147
Something that was missing on here originally has also been replaced.That is the reflective strip on the top of the hea
|
148
All boards have been serviced and the head is mostly reassembled.
|
149
Lower cabinet rebuild in process.
|
150
The power box was torn down.The corrosion was sanded off.The correct US spec varistor and service out;let was added and t
|
151
The correct style tags were added.
|
152
The wires were completely replaced from the power box to the power cord plug in.
|
153
The transformer is solid but a rusty mess.
|
154
The transformer was sanded,cleaned including the wiring and refinished to freshen it up.
|
155
Rebuilt power box and tyransformer installed along with new siderails.
|
156
Head is back on the lower and it is ready to set back on it's own legs.
|
157
|
158
|
159
Now that the cabinet is pretty much ready I can get back to the playfield.The playfield has been done for a couple weeks
|