81
The metal was reconditioned to a appropriate level for the location and use.The switch was cleaned,adjusted and tested.
|
82
Underside is done the same.
|
83
Motor and more seen portions were polished and a new thicker guage and slightly longer cable has been made up to insure
|
84
Now the up and down bank.I hate dealing with these to start with LOL!This one is rough of course.
|
85
Beaten flap,corrosion and pop rivets :-(
|
86
Targets are beat as well.
|
87
Tore it down,polished and cleaned it all,installed new targets with protective sleeving on key parts of the wiring and co
|
88
New switches,protective sleeving.
|
89
Looks better.
|
90
New stainless steel flap installed with the correct rivets.
|
91
Motor polished and protective sleeving installed at the leeds to insure it hold up well.
|
92
Playfield is stripped complete now.I will start going through what remains now that I have most of the major concerns out o
|
93
All the hardware is gone through to see what will be worth reusing and what should be upgraded or replaced entirely.I
|
94
This is also going to be trashed.
|
95
Now on to some more specific things that are not so easily replaced nor do they need to be in this case.Phantom flip opto
|
96
Opto brackets reconditioned and rebuilt.
|
97
Will leave it here until tomorrow,.
|
98
Now for the lamp boards.They are mostly just dirty,need the pins reflowed and might need some new bulbs.
|
99
Lamp and other misc boards are cleaned and serviced.
|
100
|
101
The polishing of the hardware is complete,I will clean all the threads etc prior to install.
|
102
Will break the looms down now and polish those.
|
103
Loom brackets are now in good order.The looms themselves have been cleaned and put into the mass bin .I will place those
|
104
I am going to start dealing with more of the coils now.
|
105
Rough!!
|
106
Took quite a bit but I have a few of them in good order now.
|
107
|
108
|
109
|
110
T nutting the replacement playfield.I have already made the correction and cleared it.
|
111
Starting the build up.I am basically working the entire game to completion so it will jump back and forth a bit but this i
|
112
Shooter lane was widened and a nice transition between the plys was made.
|
113
Any work needed at the lagoon window was done to insure a nice flowing fit.
|
114
Correct factory style bevel was made at the mosh pit hole.No sharp eges to chew up in a few plays.
|
115
|
116
|
117
|
118
Back to coils.The popper is junk.
|
119
New popper rebuilt.
|
120
Gate coils cleaned and polished.
|