159
Lighter blue done in the troubled area.
|
160
The green mist multiball insert bordering issues are fixed.
|
161
The lower insert wear is addressed,
|
162
Red and Dracula lettering repainted.
|
163
This is about as far it can go in this session.There will be a couple minor things to be addressed during the final but
|
164
The inlane switch area is at about 75% right now.This is the key area that will need a little more detail work but the co
|
165
The entire center of the playfield looks much better now.There is no way I can fix everything but the overall is looking
|
166
Dracs face and the surrounding area look promising.
|
167
|
168
|
169
Ready to clear.
|
170
Cleared.
|
171
This is about the only things left to correct on the final pass.
|
172
|
173
|
174
|
175
After this sets overnight I will be able to sand it down make the final corrections and apply the final clear.
|
176
Dry and ready to evaluate as well as prep for the final repaints and clear.
|
177
Will work on tightening this up as well as possible.Very tough fix so perfection isn't going to be possible but getting
|
178
A little more work will be done to the hole repair and a touch to the orange portion of Dracs face.The upper most ne
|
179
Sanded and ready for the final repaints.
|
180
One wave of details done.Several colors addressed here and there is an effort to better define the shooter lane transi
|
181
|
182
Final wave of details painted.
Could not fix every single flaw as that would require a total repaint and would lose
|
183
|
184
Final clear applied.
|
185
|
186
Shooter lane is much improved over the beat ground in dirt version it started as.
|
187
I am satisfied with this area knowing how big a challenge it is to recreate this type of art from scratch.Should sh
|
188
|
189
this is the highlight of the repair process.Lots of issues were overcome.
|
190
Playfield is all set now so I can continue on with the final rebuild.In a few days the playfield will be ready for f
|
191
Apron is prepped and repairs will be made then cleared.
|
192
Apron reworked and cleared.
|
193
Playfield is final sanded and polished.
|
194
|
195
|
196
|
197
|
198
Backside is sanded as clean as possible now ready to t nut.
|