Lower gutted.
|
53
|
54
|
55
|
56
|
57
Cabinet is moved to the cabinet shop for perfect duplication but it will be built with much better materials and
|
58
New lower is built.We will compare the construction side by side.
|
59
The new lower is hand built so it is not done by CNC etc.
|
60
|
61
The neck on these games are very much a pain to build.They are originally built from the factory with scraps.
|
62
The new lower has solid mahogany blocks at the hinge mount for added strength.
|
63
The original neck is only lightly nailed in place.
|
64
The newly hand built cabinet has the neck screwed in place and then those screwed are covered with inserts to hid
|
65
Stood up and looking at these side by side.
|
66
The metal plate from the original will not be needed on the replacement.
|
67
The replacement floor is made out of a much more solid wood product and is more than twice as thick.
|
68
In addition the all sides are glued the full length of the box.No gaps at all.
|
69
|
70
The various holes are perfectly copied as well.
|
71
Now I am ready to prep the new lower.I will need to drill some holes fro the coin door frame and lock bar handle pivo
|
72
|
73
Coin door area pre drilling.
|
74
Front is now drilled and we can proceed.
|
75
The original head will be reworked.I have glued and screwed the framing first from the inside now I will strip it.
|
76
Head is stripped and all seams,gaps and various damage are being filled and repaired.
|
77
Repairs to the head are complete.
|
78
|
79
Head ready to prime.
|
80
Lower is ready to prime.
|