240
New wiring is used to jump the chains together.
|
241
All metal cleaned and polished.Coil assemblies fully rebuilt.
|
242
All new sockets.Protective sleeving used where shorts could potentially happen.
|
243
Playfield is in the cabinet.
|
244
|
245
|
246
In the home stretch now.Tough one.
|
247
Powered up for testing.Took a little extra effort to get the strobe going again.Connection issues and the small transf
|
248
All playfield lights and functions work properly.Apron is in place.
|
249
Working with the ramps.New ones would be nice of course but that isn't possible nor practical so small flaps are mad
|
250
Same process other side.These are very small just long enough to cover the gap and transition.Should absorb the e
|
251
For the transitions going to the upper playfield shims are made and installed as needed to give each ramp a smooth tra
|
252
Each location is tested with a ball to ensure it does not hop or catch.
|
253
The upper playfield is being finished with the new plastic set.
|
254
|
255
|
256
I will fix the spinners now.
|
257
|
258
Spinners are removed from the housings.
|
259
The spinners are cleaned and prepped.Now based and clearcoated.Lightly based on the face side to help with art plac
|
260
Fully based on the non faced side and cleared.After these set a day I will reassemble them and deal with art place
|
261
A strobe cover is made.Nothing fancy but it is a good fit and being made out of cardboard there is no risk of it i
|
262
Some overall pictures of where things are at.
|
263
|
264
|
265
|
266
|
267
Maybe another day or so and we should be all done.
|
268
Spinners are rebuilt.I just used the art portion of the decals to complete them.This should work better than using t
|
269
|
270
All plastics are placed and the playfield portion is complete less a little detail work and the setting of the flippers
|
271
|
272
|
273
I will prep the backglass next and install that then it should be ready for final pictures and test play.
|
274
Backglass is cleaned and evaluated.
|
275
There are some areas that were flaking and have been previously repaired then presumably triple thicked over.
The
|
276
Other previous repairs documented.
|
277
|
278
New trim and a new chrome channel are installed.
|
279
Glass looks decet from the front so we will go with that .A new glass would be more ideal but I am not sure how w
|